COLORADO, USA — Keep up to date with traffic in Denver metro area with the 9NEWS traffic blog.
There are several road closures, and traffic as snowfall continues across the state. here are a few to look out for if traveling this holiday.
Interstate 70
CLOSURE
- Roads are closed between Exit 114, West Glenwood (Glenwood Canyon) and Exit 133: Dotsero due to safety concerns.
>>There is a width limit in effect. There is a weight limit in effect. Width limit 12'6". Until Jan. 22, 2022, at about 11:59 PM MST.
- The right lane is closed at Exit 11, US 6; Mack due to a crash. This exit is 3 miles west of the Fruita area.
- Road closed expect delays due to safety concerns between Exit 260: C-470; C-470; Morrison and Exit 259, Golden (Mount Vernon Canyon).
RE-OPENING
- Exit 270: Harlan Street (Wheat Ridge) has reopened to traffic.
OTHER
- Chains or alternative traction devices are required for all commercial motor vehicles including buses and vans of 16 or more passenger capacity between Exit 203: CO 9; East Frisco (Silverthorne) and Exit 216: US 6; Loveland Pass (Eisenhower Tunnel).
Between Exit 203: CO 9; East Frisco (Silverthorne) and Exit 216: US 6; Loveland Pass (Eisenhower Tunnel) from Mile Point 205 to Mile Point 213.5.
>Video in the player above will rotate through various CDOT cameras.
Interstate 25
CLOSURE
No issues at this time
RE-OPENING
No issues at this time
OTHER
No issues at this time
Several major construction projects are ongoing in metro Denver currently. They include:
Central 70
The Central 70 Project will reconstruct a 10-mile stretch of I-70 between Brighton Boulevard and Chambers Road. The project will remove a 56-year-old viaduct, as well as lower the interstate between Brighton and Colorado boulevards. A 4-acre park will be built over a portion of the lowered interstate, and one Express Lane will be added in each direction. The project is slated for completion in 2022.
> More information on the Central 70 project can be found here.
I-25 South Gap
The 18-mile South Gap Project is split into three geographic sections – north (between Plum Creek Parkway and Sky View Lane/Tomah Road), middle (between Sky View Lane/Tomah Road and Greenland Road) and south (between Greenland Road and Monument). The project will add one express lane in each direction in addition to the two general use lanes. It’s slated for completion in 2022.
> More information on the South Gap project can be found here.
C-470 Express Lanes
The C-470 Express Lanes Project is located along 12.5 miles of C-470 between I-25 and Wadsworth Boulevard. The project will add two express lanes to westbound C-470 from I-25 to Colorado Boulevard and one express lane westbound from Colorado Boulevard to Wadsworth. It also will add one express lane eastbound from Wadsworth to I-25.
>Check out the live traffic map below.
> More information on the C-470 Express Lanes project can be found here.
> CDOT provides in-depth information on all its current active construction projects here.
SUGGESTED VIDEOS: Latest from 9NEWS
MORE WAYS TO GET 9NEWS
Subscribe to our daily 9NEWSLETTER for top stories from 9NEWS curated daily just for you. Get content and information right now for can’t-miss stories, Next and Broncos content, weather and more delivered right to your inbox.
DOWNLOAD THE 9NEWS APP
iTunes: http://on9news.tv/itunes
Google Play: http://on9news.tv/1lWnC5n
HOW TO ADD THE 9NEWS APP TO YOUR STREAMING DEVICE
ROKU: add the channel from the ROKU store or by searching for KUSA.
For both Apple TV and Fire TV, search for "9NEWS" to find the free app to add to your account. Another option for Fire TV is to have the app delivered directly to your Fire TV through Amazon.